The end of the second work is highly accurate with the arrival of screeds. To simplicity of application (and a fairly low overhead), we decided to make the 2-story floor screed. The
topping workers was reached on August 30 for preparations: development of Polian and the peripheral band on the floor and setting candles.



is the day that the treads were cast in less than 3 hours (cleaning tools included). 2 trucks were required to be tops over 12.5 m3!



Following this, close the house for 48 hours.
Only last Friday we were able to re-enter the house.