Sunday, December 20, 2009

Gays Contact No. In Mumbai

House over!

As promised some pictures of our room over ... well almost, there is the door to paint!









I take this opportunity to show that the snow was also falling at home ... -18 ° C last night!



Thursday, December 17, 2009

Which Is The Best Secure Encryption Algorithm

New!

More than 3 months without doing any updates ... is not all that serious! Is that it takes to build a house and suddenly we no longer have much time to do other things. We'll try to catch up and bring you the latest advances. We approach the goal and although we left our apartment, we do not live in the house so far. In the meantime we squatting among parents Villette:) For now houses the garage boxes and furniture and the remainder is scattered in the living room.

The boiler (and any pipes) was installed in October:


Some pieces are finished but there is still a lot of things to do (paint, wallpaper ...) in others.

The bathroom on the ground floor is the most advanced. Missing just 2.3 tinkering but it may well be aware of the final result:





The toilet floor is almost complete, there remain some issues to fix and we can decorate it:


The home theater room is well advanced and it only needs the wallpaper. By painting cons we have chosen not ultimately a very good record and we see the marks of the roll. We will see the result with the screen and if that does not fit, you could always repaint!


The bathroom upstairs is also well advanced, it only needs paint and a good cleaning:




The stove was installed in the living room last Saturday:


The lounge is also well advanced, with the tile and baseboards, and the underlayer. It is "more" than the walls to do:


For cons the kitchen is on stand-bye because of the sink that was cracked when we got out of the box. Yet we had indeed verified when it was recovered but without removing it. Normally his replacement arrives tomorrow, so we should be able to attack more this weekend:


Otherwise the plaster exterior was made in early October and we are pleased with the record. We would have finished gratée, but the protection is less than the crushed, so the reliability of reason has prevailed.





Otherwise jumble:
Electricity is completed and the consuel rose. It took a few things change and we must return the certificate as what it has occurred. I hope he does not go back, just to save the cost of a visit. The
garage is fully insulated and 2-door work.
The master bedroom has been over for tonight, picture this weekend.

Thursday, September 10, 2009

Muscular System Of A Toad

Is it dry! The fork is the

Now that the treads are cast, wait for it to dry. So the site is a little idle but there is still much to do. We have less than 3 months to finish everything (giving notice of 30 November) or we will do some camping! Meanwhile

sanding screeds, it should be sanding walls and ceilings (not the most interesting part), terminate the electricity pass underlayment ...

Otherwise it remains the garage that is still raw. Initially we wanted to do later, but finally, last weekend we decided to go in its development: wooden floor upstairs to serve as attic and have a storage space, ceiling insulation and lamination . It took us 3 1 / 2 days to do everything. We worked hard:)






Monday morning, the party wall with the house has been doubled.

Periods Due Today When Should I Test

runs ...

The end of the second work is highly accurate with the arrival of screeds. To simplicity of application (and a fairly low overhead), we decided to make the 2-story floor screed. The
topping workers was reached on August 30 for preparations: development of Polian and the peripheral band on the floor and setting candles.




is the day that the treads were cast in less than 3 hours (cleaning tools included). 2 trucks were required to be tops over 12.5 m3!




Following this, close the house for 48 hours.
Only last Friday we were able to re-enter the house.