Friday, February 26, 2010

Monday Milk Proxies For Facebook

Living / Dining The kitchen

Here, it's been over a week we live in the house and start to take our brands. The boxes are emptied slowly and furniture take their place.

The sofa and the table were delivered Wednesday, so we have some semblance of furniture in the lounge / dining room. It's still a bit empty but it's a good start.

This weekend it continues, and we try to empty the garage and storing the mezzanine ... Photos to follow:)







Sunday, February 21, 2010

Is A Soap Taste In Mouth A Pregna

After tchouk tchouk nougat, and it is tchikk tchoukk who appear on stage!


Well yes! It seems that a new project is being born. We bought two Longtze Used: Lufthansa and Athema not to name them. As it does not do the solo off, we're set to six. It's really nice to restart collective projects. When you're alone to build his thing, it is sometimes the penalty can not share both good and bad times. These are the adventures a little selfish.
But then why two boats?! The crew
type Longtze framed by a gauge minimum and maximum weight is composed of 4 or 5. And finally after considering this media with each other, I realized that we could quickly be likely to want to go! Then Olivier (aka sinus) whispered to me the idea of having two boats to be able to mount drives solid, being sometimes more at the pub in the evening after exercise. I returned this idea in my head and I thought it was great. We can run different programs on ships: there may be a more light sometimes one and the other boat can run the circuit. The boat Elite and Team B The boat of the "old" and the boats of the young. We're not the first to have thought up a team of two boats. Except that it remains accessible Longtze. Especially a boat is rented on the circuit and we student finance in part the overall operation. Short! The team tchouk & tchouk was born!
We're a little frightened by the level of the plateau and therefore agree to make a small discovery in 2010 of the boat without ambition. We'll see if the graft takes? I think there are ways to have fun on the water while revising its product lines in the middle (or tail!) Noted a plateau.
We are always safe looking for a sponsor for a pittance could take this team and effect of beautiful images that these vessels provide. So for the fans!
And anyway, if some are interested in the series, they appear!
There are 4 major appointments this year as are the Grand Prix of the Naval Academy, Cowes Week, the Lake Garda Regatta (early September) and the finals in Switzerland in October.

A
you read!

Thursday, February 11, 2010

Poems Of Griha Pravesh



Like what the work is nearing completion, the kitchen is almost complete ... It only needs the outlet plates and a shelf. In any case we are delighted with the result:)

Monday, February 8, 2010

Seasons Greetins Text

Moving in the crosshairs move

This is only a matter of days before we can finally take possession of the walls. Everything is accelerating and with the holidays should be able to complete the finishing touches in the week. Hopefully we'll be there this weekend, it would be perfect for valentine;)

The balustrade of the staircase is complete and we are quite happy with the result:






And before the big cleanup, a small view of the vanity unit in bathroom:

Thursday, February 4, 2010

Acoustic Solution Tv Switching Off

Soon

A few days the move things are becoming clearer: we have 2, 3 shots roll-up (once we have found the painting ...) and some small details to finalize. After that, the house is finally ready to welcome us!

If all goes well, the earth will be done tomorrow or Monday and we can finally find out almost finished. This should give a different visual of the house!

Meanwhile, what has changed since the last time?
Well, the whole floor is finished, only the guardrail is complete (that way) and there is a good shot of cleaning up to do.
The ground floor is also on track: the paper entry is made (really nice, we like a lot) and cabinet doors are installed. It only remains to arrange it. The kitchen is fully completed, since the valve was installed. The cellar is also constructed and is ready to receive our utensils. I think it will be very nice cook in this house ... If there are amateurs, they are very welcome!

Come on, enough chat, here are the pictures!