Once windows installed, we could resume the installation of the plasterboard. In 15 days it was well advanced and the whole floor is now doubled, with the exception of windows to allow installation of heaters.
Once the tower is, one could attack the walls and it's fun to finally see the rooms taking shape. We spend a large space with several small but it feels more in a house. We can finally see the volume of each piece and project themselves with furniture and decoration.
should still finish the bathroom and install the doors. We also made our choice: It will flush doors of the brand Jeld Wen. Visually simple but well within our vision without panel. By cons for the 3 on the ground floor and one of our room, we ordered more design templates with etched patterns. For the ground floor will be the model "cascade" model and "bud" to our room.
our room (it still lacks the wall of the bathroom along the stairs)
the bathroom not yet finished (basically the toilet not quite closed)
toilet door